Home / Applications / Headrest bracketsSheet 16 · Headrests
Headrest brackets
Headrest frames from tube, finished in one machine.
Embossing, bending, notching and swaging tube in six stations. Tube sections are fed by a hopper conveyor, and part families with different leg lengths need little retooling.
6 m (19.7 ft) back wall, 6 stations
Data
Typical values for a headrest line. Your part decides the final layout.
| Machine | X2000NC tube line |
| Stations | 6 |
| Tube | 14 × 1.5 mm |
| Material | Wire or tube |
| Back wall | 6 m (19.7 ft) |
| Drive | Servo-electric slides and presses |
How it is made
Example from an earlier machine: 1/2″ tube with bends, notches, a stamped letter and chamfers, at 12 parts/min, for a part family with several lengths.
A measuring station with reporting can be added.
| Step | On the machine |
|---|---|
| 1 | Feed tube sections from the hopper conveyor |
| 2 | Emboss and stamp |
| 3 | Notch |
| 4 | Bend |
| 5 | Swage and chamfer the ends |
| 6 | Measure (optional); the finished bracket leaves the machine |

Making a part like this?
Daniel comes to your plant anywhere in the USA and Canada to look at your part and your current process with you.
Related